Images of the 16 inch F4 Run-off Roof Observatory during construction August 2011.

Both the Run-off Roof Observatory for the Wide field camera and this observatory will have thier roof run off well to the South.

The Run-off Roof Observatory at this time runs off to the North. This will be rotated soon (August 2011) and have longer rails installed. This will allow for greater sky coverage for both observatories.

Page links to each stage of construction:-

16 inch F4 Run-off Roof Observatory Construction of the slab

16 inch F4 Run-off Roof Observatory Construction of the walls

16 inch F4 Run-off Roof Observatory Roof Drive Mechanism

16 inch F4 Run-off Roof Observatory Construction Complete